As one of the fastest growing regional airports, Bristol International Airport
needed to expand and create more apron space. For this expansion to
take place, it was necessary to relocate Bristol Flying Club from the north
side of the airport to the south side, and provide additional light aircraft
parking. Civil engineers BAM Nuttall chose REIDsteel to construct the
new steel buildings.

Construction of the 30m by 60m steel portal frame maintenance hangar was undertaken on a design and build basis, whilst the new 2-storey steel framed office building was designed by the client’s own team. Maximum clear entry was required for the hangar, but as the office building was built just a few metres to the right of the hangar, there was only room for an outrigger to the left of the doors. REIDsteel were able to overcome building space limitations, and design a practical and economical hangar which met all of the specifications.

Close liaison with airport staff and enforcement of a strict safety regime on the contract enabled safe completion of the works with minimal disruption to ongoing operational activities at the airport.

For more information, contact sales:
Tel: +44 (0) 1202 483333 • Email: sales@reidsteel.co.uk
Malta Aircraft Museum

Malta

We built this beautiful 23m clear span hangar for the Malta Aircraft
Museum in 2005.

The project was funded by donations from ex WW2 veterans and the style had to reflect the era of the Second World War and houses a Supermarine Spitfire, a Hawker Hurricane and period Anti Aircraft Guns as well as other WW2 memorabilia.

Malta, the George Cross Island, is rightly proud of its steadfast resistance to the tyranny that swept across Europe during the 1930s and 40s.

The roof, walls and hangar doors all consist of 40mm thick composite cladding.

For more information, contact sales:
Tel: +44 (0) 1202 483333 • Email: sales@reidsteel.co.uk
KLM Hangar Extension

Norwich International Airport, UK

KLM UK Engineering who specialise in the maintenance, repair and
overhaul of aircraft, have their main base at Norwich International Airport.
Due to existing and new contracts KLM were in need of more space and
increased tail entry height.

They decided to refurbish an existing hangar which incorporated a 10 metre hangar extension supplied and erected by REIDsteel to accommodate a fabric megadoor with drop down posts which was supplied and installed by others.

The hangar can now house the new version of the Boeing 737.

Main Contractor for the project was May Gurney, and the hangar doors are of the fabric Megadoor type in 3 panels. The middle door section being 15m height and 10m width, and the panels either side reducing in height to 11.5m high but increasing in width to 17.5m to make a 45m overall door width.

For more information, contact sales:
Tel: +44 (0) 1202 483333 • Email: sales@reidsteel.co.uk
British Airways Flying Club

Booker Airfield, High Wycombe, UK

Booker airfield is home to a number of Reidsteel structures. The airfield
also known as Wycombe Airpark, is a destination where recreational and
commercial flyers can receive the highest quality training.

The air park is home to over 200 aircraft from gilders to vintage aircraft such as Tiger Moths.

Three hangars were built for Airways Aero Association to replace existing T2 hangars which all span 30m with either bottom rolling hangar doors or bifold doors at the ends. A total of 4930m2 of hangarage was provided as a functional base for maintaining AAA’s fleet of training aircraft.

For more information, contact sales:
Tel: +44 (0) 1202 483333 • Email: sales@reidsteel.co.uk
Police Hangar

Nigeria

This project involved a build with a 46 x 40m sized hangar and a twostorey
office of 37 x 12m along one side and 52 x 9m along the rear. The
suspended floors consisted of floor beams, joists and metal decking for in
situ construction.

The hangar doors are 6 slabs on 3 tracks nigeria police hangargiving an entrance of 34m wide and 7.2m high and REIDsteel also supplied a manually operated shutter door 4.5m high by 5m width, personnel doors and all the windows and glazing elements.

Spanning 38m across the hangar is an underslung hoist beam supporting a 2 tonne Series 3 electrically operated chain hoist.

This hangar was the first of three delivered to the same site.

For more information, contact sales:
Tel: +44 (0) 1202 483333 • Email: sales@reidsteel.co.uk
Vektra Aviation Hangar

Podgorica Airport, Montenegro

Vektra Aviation is a VIP airline based in Montenegro. This steel framed
aircraft hangar at its main base in Podgorica Airport is large enough to
hold all five aircraft currently in the fleet.

The hangar is 40m x 52m, with a clear height of 12.6m complete with insulated roof and wall cladding including doors. Translucent panels are incorporated in the roof and walls for natural lighting. The main hangar doors are of steel frame construction and are electrically operated. The doors are bottom rolling on substantial wheels, on tracks complete with adjustable sleepers. The top door guides consist of vertical rollers moving between steel guides, which are protected from the weather by a hood and seals.

There are 6 door slabs on 3 tracks, giving an entrance 39m x 12.6m high, each slab having its own electric motor, driving the ground wheels through a reduction gear box and chain drive.

For more information, contact sales:
Tel: +44 (0) 1202 483333 • Email: sales@reidsteel.co.uk
Helicopter Hangar

Nouakchott, Mauitania, Africa

This helicopter hangar was constructed for Woodside Mauritania.

It comprises of a 25m wide by 25m long clear span portal framed structure with 2 adjoining lean to either side.

There are 5.5m outriggers on each side of the doorway, meaning doors can be rolled back to give maximum clear entry of 25m. Both the hangar doors and personnel doors were manufactured by REIDsteel.

The steelwork was designed and fabricated to accept a 2T overhead crane which spans the full 25m of the hangar.

The client was delighted with not only the structure that was shipped for his construction team to erect but also the services of Reidsteel’s experienced erection supervisors who managed the erection of steel, cladding and installation of the hangar doors.

For more information, contact sales:
Tel: +44 (0) 1202 483333 • Email: sales@reidsteel.co.uk
Summit Aviation

Maintenance Hangar, Manston Airport, UK

This 6900 m2 Aircraft Hangar was constructed for Summit Aviation in
order for them to carry out helicopter and aircraft engine maintenance.
The main Helicopter Hangar is 52m by 115m and the reception area is 22m by 41m.

The curved roof consists of standard trapezoidal cladding and the waveform roof over the reception area is in colour matched aluminium standing seam.
The wall cladding is a mixture of box profile double skin and microrib profile composite panels in Sargasso Blue and Metallic Silver.

Access doors are by Crawford UK and the Main Contractor was GSE Design and Build. The Architects were the Duncan & Graham Partnership and Engineers were Gary Gabriel Associates.

Royal Air Force

Valley Airport, Anglesey, UK

This 55 metre span, 155 metres long hangar houses and maintains the
latest generation of Hawk trainers for use by the RAF, Royal Navy and
Army Air Corps.

We also designed and constructed the 5,500 m2 Squadron building which contains classrooms, gym and changing facilities, and is used as a state of the art training school incorporating the latest technology in simulators and flying training devices to support the development of Fast Jet Pilots for the Royal Air Force and the Royal Navy. The Squadron building also supports flight planning and provides an operations hub for the fleet of Hawk Mk.T2 aircraft.

The main contractor was Morgan Ashurst and the client was VT Aerospace.